According to ODOT, the objectives of the SR 32 Corridor Improvements (Segment Iva) are to improve the safety in the project area and to improve driving times on State Route 32. Surface level intersections will be removed which will provide for continuous traffic flow on State Route 32 – this will improve commute times for commerce not only in the Batavia Township area, but throughout the entire State Route 32 Corridor (see below).
All State Route 32 Corridor improvement questions can be referred to ODOT District 8 -
ODOT District 8, Charlie Rowe, P.E., [email protected], 513-933-6596.
More information can be found at
goclermont.org. The Clermont Transportation (TID) also maintains a project hotline – (513) 835-2417. The Clermont TID meets every 2nd Friday at 9AM at the Clermont Engineer’s Office - @ their shared Conference Room – 2381 Clermont Center Drive, Batavia, Ohio. ODOT District 8 provides project updates at these meetings.